Lake Turkana Wind Farm
Sector: Manufacturing (Industrial) • Location: Kenya
Source: The Standard Media
The largest wind farm in sub-Saharan Africa located in the hot desert north of Kenya. It consists of 365 turbines installed by Vestas Wind Systems, adding 310 MW of power capacity. The project cost 70 billion Kenyan shillings ($678 million) and is Kenya's largest single private investment in renewable energy. The wind farm is ready for launch but remains idle due to delays in the construction of t
- Status
- Completed (construction) but not operational due to transmission line delay
- Sector
- Manufacturing (Industrial), Raw Materials, Power Generation (CCGT), Wind
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- The Standard Media
ConstructChat
Ask ConstructChat about Lake Turkana Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed (construction) but not operational due to transmission line delay |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The largest wind farm in sub-Saharan Africa located in the hot desert north of Kenya. It consists of 365 turbines installed by Vestas Wind Systems, adding 310 MW of power capacity. The project cost 70 billion Kenyan shillings ($678 million) and is Kenya's largest single private investment in renewable energy. The wind farm is ready for launch but remains idle due to delays in the construction of the transmission line needed to connect it to the power grid. |
Original sector | Energy |
Budget |
Location
Country | Kenya |
Source
Source | The Standard Media |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Raw Materials, Power Generation (CCGT), Wind |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in Kenya
- Kenya Electricity Generating Company Olkaria II Expansion Nairobi
- PROCESSING OF COFFEE FOR EXPORT.
- Establishment of tomato paste production unit
- Expansion of Eaglepharm Chemists in Six (6) Counties in Kenya
- CASHEWNUT VALUE CHAIN PROJECT
- CHICKEN SLAUGHTER HOUSE
- Construction of Phase II Students’ Hostels at Bukura Agricultural College
- Mumbozuma Limited
