logo

Lake-Woodbine Bridge Replacement Phase 2

Sector: Bridge • Location: Lake Forest, Illinois, United States of America

Source: Dodge

Project
Construction Documents

Replacement of the Lake-Woodbine Bridge, originally built in 1912 and rehabilitated in 1977. The project will use a pre-cast construction method to complete the work in 2024.

Status
Closed
Sector
Bridge, Road, Commercial, Government
Location
Lake Forest, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Lake-Woodbine Bridge Replacement Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lake-Woodbine Bridge Replacement Phase 2” is an infrastructure initiative in the Bridge sector, located in Lake Forest, Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

construction documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of the Lake-Woodbine Bridge, originally built in 1912 and rehabilitated in 1977. The project will use a pre-cast construction method to complete the work in 2024.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Lake Forest

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial, Government

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project