logo
ProjectBidding

Lakefield Campground Infrastructure Replacement

Bidding · Ontario · Last reported May 2024

Source: Dodge USA

In general, the Work consists of: Tree Preservation. Removal of existing meter within the chamber and installation of a new water meter and backflow preventer within the building. Removals and abandonment of existing water services. Remove and replace 100mm water main, lot service taps and hydrants to the designated locations. Remove and replace sanitary lateral services including cleanouts for de

Status
Prospective
Sector
Commercial, Water Supply and Storage, Waste Processing and Treatment, Government
Location
Lakefield, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lakefield Campground Infrastructure Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lakefield Campground Infrastructure Replacement” is an infrastructure initiative in the Commercial sector, located in Lakefield, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In general, the Work consists of: Tree Preservation. Removal of existing meter within the chamber and installation of a new water meter and backflow preventer within the building. Removals and abandonment of existing water services. Remove and replace 100mm water main, lot service taps and hydrants to the designated locations. Remove and replace sanitary lateral services including cleanouts for designated lots. Remove existing sanitary sewer main segments and install new sanitary sewer utiliz...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Lakefield

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2024-07-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project