Lakeland (FL) Walmart Supercenter 779-1017 SP
Sector: Power Transmission • Location: Lakeland, Florida, United States of America
Source: Dodge
- Demolition Of Existing Surfaces For The Installation Of Ev Chargers 2. Grading Of Surfaces Associated With Ev's To Comply With Ada Requirements 3. Install (1) Utility Transformer And Pad - To Be Coordinated With Lakeland Electric 4. Install (1) Switchboard Assembly 5. Install (4) Abb A400 All-in-one Ev Chargers 6. Install (2) Future Ev Charging Conduit Stubs
- Status
- Closed
- Sector
- Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Electric Vehicles (EVs), Automotive, Commercial
- Location
- Lakeland, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lakeland (FL) Walmart Supercenter 779-1017 SP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Demolition Of Existing Surfaces For The Installation Of Ev Chargers 2. Grading Of Surfaces Associated With Ev's To Comply With Ada Requirements 3. Install (1) Utility Transformer And Pad - To Be Coordinated With Lakeland Electric 4. Install (1) Switchboard Assembly 5. Install (4) Abb A400 All-in-one Ev Chargers 6. Install (2) Future Ev Charging Conduit Stubs |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Lakeland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Electric Vehicles (EVs), Automotive, Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
