logo
ProjectBid Results

Lakeshore Drive Phase 1B

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge USA

Due to the proximity to the lake and recent landslide remediation s along the lakeshore, the replacement of the underground utilities (water, sewer and Storm) posed the potential to destabilize the embankment. Therefore, the embankment will be reinforced with a sea wall. The seawall will not only allow for the replacement of the underground utilities, it will also allow for additional green space

Status
Closed
Sector
Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Government, Power Generation (CCGT), Manufacturing (Industrial)
Location
Cold Lake, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lakeshore Drive Phase 1B

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lakeshore Drive Phase 1B” is an infrastructure initiative in the Water Supply and Storage sector, located in Cold Lake, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Due to the proximity to the lake and recent landslide remediation s along the lakeshore, the replacement of the underground utilities (water, sewer and Storm) posed the potential to destabilize the embankment. Therefore, the embankment will be reinforced with a sea wall. The seawall will not only allow for the replacement of the underground utilities, it will also allow for additional green space to be created overlooking the lake. Updates will also be made to the flow of traffic, overall par...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Cold Lake

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Government, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project