Lakeshore Subdivision Drainage Improvements
Sector: Water Supply and Storage • Location: Humble, Texas, USA
Source: Community Impact | News
Storm sewer and inlet additions will be installed along Elm Shores Drive in the Lakeshore subdivision to increase drainage capacity and reduce flood risk. The project has completed the design phase and is pending advertising for bids.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment
- Location
- Humble, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Community Impact | News
ConstructChat
Ask ConstructChat about Lakeshore Subdivision Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design completed, pending bids |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Storm sewer and inlet additions will be installed along Elm Shores Drive in the Lakeshore subdivision to increase drainage capacity and reduce flood risk. The project has completed the design phase and is pending advertising for bids. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Humble |
Source
Source | Community Impact | News |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2026-03-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in USA
- Widen Turnpike from Glades Rd to Atlantic Ave
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- SAS CU UPW/IWT Project
- Delta Conveyance Project
- California High-Speed Rail Systemwide Sustainability Program
- Stromberg Development Tract Mixed-Use Project
- Storm Drain Trash Capture Installation on Holmes Street
- Sonoran Sparkle Diamond Mine Project
