logo

Lakeshore West Pollution Control Plant Supervisory Control and Data Acquisition Programmable Logic Controllers Replacement

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The Programmable Logic Controller (PLC) system is not maintainable in the long term and requires a comprehensive upgrade or replacement. This project will replace the aging PLC equipment. Many components of the system are out dated and replacement parts do not exist. The plant supervisory control and data acquisition (SCADA) system is based on GE 90-30 PLC processors and Input/Output (IO) modules

Project Information FAQ

Project Information

5 Q
The project “Lakeshore West Pollution Control Plant Supervisory Control and Data Acquisition Programmable Logic Controllers Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Programmable Logic Controller (PLC) system is not maintainable in the long term and requires a comprehensive upgrade or replacement. This project will replace the aging PLC equipment. Many components of the system are out dated and replacement parts do not exist. The plant supervisory control and data acquisition (SCADA) system is based on GE 90-30 PLC processors and Input/Output (IO) modules that are obsolete and reaching end of life. The manufacturer has stopped hardware production and technical support is very limited and expensive. Due to age and legacy, status system operation is at times unreliable and performance and capabilities are restrictive to operations. As such the PLC system is not maintainable in the long term and requires a comprehensive upgrade or replacement.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data