Lakeshore West Pollution Control Plant Supervisory Control and Data Acquisition Programmable Logic Controllers Replacement
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
The Programmable Logic Controller (PLC) system is not maintainable in the long term and requires a comprehensive upgrade or replacement. This project will replace the aging PLC equipment. Many components of the system are out dated and replacement parts do not exist. The plant supervisory control and data acquisition (SCADA) system is based on GE 90-30 PLC processors and Input/Output (IO) modules
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Programmable Logic Controller (PLC) system is not maintainable in the long term and requires a comprehensive upgrade or replacement. This project will replace the aging PLC equipment. Many components of the system are out dated and replacement parts do not exist. The plant supervisory control and data acquisition (SCADA) system is based on GE 90-30 PLC processors and Input/Output (IO) modules that are obsolete and reaching end of life. The manufacturer has stopped hardware production and technical support is very limited and expensive. Due to age and legacy, status system operation is at times unreliable and performance and capabilities are restrictive to operations. As such the PLC system is not maintainable in the long term and requires a comprehensive upgrade or replacement. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
