Lakeside Boulevard Reconstruction
Under construction · Texas · Last reported Apr 2026
Source: Community Impact | News
Crews are reconstructing the street and implementing utility improvements on Lakeside Boulevard from US 75 to Campbell Road, and Lawnview Drive from Lakeside to Greenville Avenue. Installation of the waterline sewers from the roundabout to Campbell is currently underway, along with work in the Lawnview median.
- Status
- Under Construction
- Sector
- Power Transmission, Road, Power Generation (CCGT)
- Location
- Richardson, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Community Impact | News
ConstructChat
Ask ConstructChat about Lakeside Boulevard Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Crews are reconstructing the street and implementing utility improvements on Lakeside Boulevard from US 75 to Campbell Road, and Lawnview Drive from Lakeside to Greenville Avenue. Installation of the waterline sewers from the roundabout to Campbell is currently underway, along with work in the Lawnview median. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Richardson |
Source
Source | Community Impact | News |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Power Generation (CCGT) |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in USA
- Town Engineering Expansion
- Stack EFG - Utility Electrical Distribution
- East Campus Parking Deck Transformer Replacement
- Avenir SUA Maintenance Facility
- Alton PCD Amendment
- Repair of High Voltage Switch Box Bases
- Country Club Ranches Water Main Improvements Ph I
- Widen Turnpike SR 91 from Golden Glades Toll Plaza to the Broward County
