Lakeside Drive Bulkhead Phase 3& 4
One of 10,000+ projects Taiyo tracks in New Jersey.
Source: Dodge
Mobilization LS 2. Bulkhead Replacement with Helical Anchors 438 LF 3. HMA Milling, 3 or Less 325 SY 4. Dense Graded Aggregate Base Course, 8 Thick 350 SY 5. Hot Mix Asphalt 19M64 Base Course, 4 Thick 350 SY 6. Hot Mix Asphalt 9.5M64 Surface Course, 2 Thick 670 SY 7. Coarse Aggregate, Size No. 57 650 CY 8. 12 Ductile Iron Pipe 36 LF 9. Cleaning and Restorations LS 10. Excavation, Test Pit 10 CY 11
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Road, Commercial, Government, Metal, Steel
- Location
- Forked River, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lakeside Drive Bulkhead Phase 3& 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mobilization LS 2. Bulkhead Replacement with Helical Anchors 438 LF 3. HMA Milling, 3 or Less 325 SY 4. Dense Graded Aggregate Base Course, 8 Thick 350 SY 5. Hot Mix Asphalt 19M64 Base Course, 4 Thick 350 SY 6. Hot Mix Asphalt 9.5M64 Surface Course, 2 Thick 670 SY 7. Coarse Aggregate, Size No. 57 650 CY 8. 12 Ductile Iron Pipe 36 LF 9. Cleaning and Restorations LS 10. Excavation, Test Pit 10 CY 11. Electrical Site Work, including in-kind replacement of all wire, receptacles, and conduit LS 12... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Forked River |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Road, Commercial, Government, Metal, Steel |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
