Lakeside Elementary Kitchen Renovation
Sector: Manufacturing (Industrial) • Location: Orange Park, Florida, United States of America
Source: Dodge USA
- Phasing: The project involves two phases: Addition, during which the addition and site work is to be completed; and Remodel, where the interior of the existing building is modified. The school and cafeteria will be occupied during the first phase. The second phase must occur during the summer and the entire project is to be completed by the end of the summer break. 2. Demolition: The project in
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 1. Phasing: The project involves two phases: Addition, during which the addition and site work is to be completed; and Remodel, where the interior of the existing building is modified. The school and cafeteria will be occupied during the first phase. The second phase must occur during the summer and the entire project is to be completed by the end of the summer break. 2. Demolition: The project involves demolition of existing interior walls and the creation of several new openings in the exte... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Manufacturing (Industrial) projects in United States of America
- Beardslee Blvd Widening
- 2019-ADA Curb Ramps
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- LEGALIZE/CONSTRUCT REAR BATHROOM ADDITION 67 SQ.FT.
- TRACT 8304- BUILDING 12- UNIT 1204-PLAN B2E-ALT-4BD/3BA 2025 SQ FT LIVING,472 GARAGE,11 PORCH, 0 DECK
- VERIZON ANTENNA MODIFICATIONS TO EXISTING TOWER MOUNTED AND GROUND MOUNTED EQUIPMENT
