Lakeside Island Park Bridge Replacement
Sector: Commercial • Location: Sterling Heights, Michigan, United States of America
Source: Dodge USA
The scope of the project includes the removal and replacement of the shared use bridge leading to Lakeside Island Park. Removal of the existing HMA pathway and replacement with a new concrete path. Installation of a new gravel pathway, riprap, and picnic areas along the perimeter of the new island.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The scope of the project includes the removal and replacement of the shared use bridge leading to Lakeside Island Park. Removal of the existing HMA pathway and replacement with a new concrete path. Installation of a new gravel pathway, riprap, and picnic areas along the perimeter of the new island. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
