Lakeside Parkway Concrete Panel Replacement
The owner, status and timeline of this project. A free account opens every field.
Source: Community Impact | News
Concrete panel replacements along Lakeside Parkway between Long Prairie Road and town limits, replacing around 11,215 square yards of concrete pavement along roughly 2.37 miles of road. The project addresses multiple spots of concrete deterioration and is separate from a proposed road widening.
- Status
- Prospective
- Sector
- Cement, Road, Government
- Location
- Flower Mound, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Community Impact | News
ConstructChat
Ask ConstructChat about Lakeside Parkway Concrete Panel Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Concrete panel replacements along Lakeside Parkway between Long Prairie Road and town limits, replacing around 11,215 square yards of concrete pavement along roughly 2.37 miles of road. The project addresses multiple spots of concrete deterioration and is separate from a proposed road widening. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Flower Mound |
Source
Source | Community Impact | News |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Government |
Article published date | 2025-11-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in USA
- Galvanic Concrete Encasements for Accelerated Repair and Service Life Extension
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- Prestress Losses in UHPC and Hybrid Precast, Prestressed Bridge Girders
- Prep-work to begin on Memorial Bridge project
- Truck Parking at Canoe Creek Service Plaza
- Orchard Drive East Road Improvement Project
- Celina Parkway Repair and Resurfacing
- Barnard Barn Artist Studio Conversion
