Lakewood Interconnect Meter New SCE Service REBID
Sector: Energy Storage • Location: Long Beach, California, United States of America
Source: Dodge USA
LBUD intends to receive power from Southern California Edison to power equipment at the existing interconnection between Long Beach and Lakewood. The existing solar panel and battery systems used to operate the Lakewood Interconnect Facility will be removed.
- Status
- Prospective
- Sector
- Energy Storage, Commercial, Power Transmission, Government, Solar, Power Generation (CCGT)
- Location
- Long Beach, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lakewood Interconnect Meter New SCE Service REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | LBUD intends to receive power from Southern California Edison to power equipment at the existing interconnection between Long Beach and Lakewood. The existing solar panel and battery systems used to operate the Lakewood Interconnect Facility will be removed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Long Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial, Power Transmission, Government, Solar, Power Generation (CCGT) |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 9.6 KW 24 MODULES AND 13.5 KWH ENERGY STORAGE SYSTEM N 225A LOAD CENTER
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 7.02 KW 18 MODULES AND 1 CHEM BATTERY AT 9.8KWH
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.78 KW 13.5KH ENERGY STORAGE SYSTEM
- INSTALL (16) TILTED 355W MODULES AT 5.68 KW TOTAL. INSTALL ( 1) TESLA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL TESLA SOLAR ROOF 13.92 KW 27 KWH ENERGY STORAGE SYSTEM NEW 225A DISTRIBUTION PANEL
- ROOFTOP PV SOLAR PANEL INSTALL (21) 400W MODULES AT 8.4 KW T OTAL. INSTALL (1) LG CHEM BATTERY AT 9.88 KWH CAPACITY
- ROOFTOP SOLAR PANEL INSTALL: (10) 400W MODULES AT 4.0 KW TOT AL. INSTALL (1) LG CHEM BATTERY AT 9.8 KWH CAPACITY.
