logo

Lakewood Wastewater Authority Lift Stations #5 & #14 Impr

One of 10,000+ projects Taiyo tracks in Michigan.

Source: Dodge

Project
Closed

Work of the Project includes improvements to two Lakewood Lift Stations, #5 and #14, located in Lake Odessa, Michigan. Improvements include replacing the existing Smith & Loveless suction lift package pump stations with new Gormann Rupp packaged pump stations, Lift Station #5 wet well modification and lining, adding a flow meter and chamber to Lift Station #14, generator replacement at Lift Statio

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Government
Location
Lake Odessa, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Lakewood Wastewater Authority Lift Stations #5 & #14 Impr

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lakewood Wastewater Authority Lift Stations 5 & 14 Impr” is an infrastructure initiative in the Water Supply and Storage sector, located in Lake Odessa, Michigan, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work of the Project includes improvements to two Lakewood Lift Stations, #5 and #14, located in Lake Odessa, Michigan. Improvements include replacing the existing Smith & Loveless suction lift package pump stations with new Gormann Rupp packaged pump stations, Lift Station #5 wet well modification and lining, adding a flow meter and chamber to Lift Station #14, generator replacement at Lift Station #5, installation of force main valves and cleanouts, electrical systems improvements, fittings,...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Lake Odessa

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Government

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project