LAM Office Building
Sector: Metal • Location: Tualatin, Oregon, United States of America
Source: Dodge USA
a new four-story building containing 120,000 SF of floor area in the southern part of the existing site, to the east and south of existing buildings. The new office building will be connected to the existing officing building to the west (Building C) via a skybridge). The proposed parking expansion of approximately 578 stalls will be east and northeast of the proposed building, as well as to the n
- Status
- Prospective
- Sector
- Metal, Commercial, Manufacturing (Industrial), Car parking, Residential, Automotive
- Location
- Tualatin, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about LAM Office Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | a new four-story building containing 120,000 SF of floor area in the southern part of the existing site, to the east and south of existing buildings. The new office building will be connected to the existing officing building to the west (Building C) via a skybridge). The proposed parking expansion of approximately 578 stalls will be east and northeast of the proposed building, as well as to the north of Building F. The new building and parking addition will allow Lam to increase employment a... |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Tualatin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Manufacturing (Industrial), Car parking, Residential, Automotive |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
