Lancaster WWTP Optimization & Floodproofing REBID
Sector: Chemical (Industrial) • Location: Lancaster, South Carolina, United States of America
Source: Dodge USA
The Project includes the following Work: 1. Rehabilitation of existing influent pump station including replacement of the existing pumps, check valves and knife gate valves, piping modifications, and replacement of all gaskets. 2. Upgrading equipment associated with the influent pump station, including replacing VFDs and soft starters. 3. Installation of truck unloading station. 4. Install four (4
- Status
- Prospective
- Sector
- Chemical (Industrial), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Lancaster, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lancaster WWTP Optimization & Floodproofing REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: 1. Rehabilitation of existing influent pump station including replacement of the existing pumps, check valves and knife gate valves, piping modifications, and replacement of all gaskets. 2. Upgrading equipment associated with the influent pump station, including replacing VFDs and soft starters. 3. Installation of truck unloading station. 4. Install four (4) aerators in equalization basin and associated controls. 5. Draining Oxidation Ditches and remov... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Lancaster |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- William Pond Chemical Toilet Replacement
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- State-Based Public Health Laboratory Biomonitoring Programs
