Lancaster WWTP Optimization & Floodproofing REBID
Sector: Water Supply and Storage • Location: Lancaster, South Carolina, United States of America
Source: Dodge USA
The Project includes the following Work: 1. Rehabilitation of existing influent pump station including replacement of the existing pumps, check valves and knife gate valves, piping modifications, and replacement of all gaskets. 2. Upgrading equipment associated with the influent pump station, including replacing VFDs and soft starters. 3. Installation of truck unloading station. 4. Install four (4
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Commercial, Waste Processing and Treatment, Manufacturing (Industrial), Government
- Location
- Lancaster, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lancaster WWTP Optimization & Floodproofing REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: 1. Rehabilitation of existing influent pump station including replacement of the existing pumps, check valves and knife gate valves, piping modifications, and replacement of all gaskets. 2. Upgrading equipment associated with the influent pump station, including replacing VFDs and soft starters. 3. Installation of truck unloading station. 4. Install four (4) aerators in equalization basin and associated controls. 5. Draining Oxidation Ditches and remov... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Lancaster |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Commercial, Waste Processing and Treatment, Manufacturing (Industrial), Government |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
