logo

Lancium Childress AI Data Center Campus

Sector: Water Supply and Storage • Location: Childress, Texas, United States

Source: Tech Times

Project
Operational

Lancium announced a 1.0 GW AI data center campus in Childress, Texas, in partnership with Crusoe. Lancium owns the land, secures the ERCOT grid interconnect, and manages energy infrastructure including power orchestration, behind-the-meter solar, and battery storage. Crusoe designs, builds, and operates the data center buildings. The campus uses a closed-loop, non-evaporative liquid cooling system

Project Information FAQ

Project Information

3 Q
The project “Lancium Childress AI Data Center Campus” is an infrastructure initiative in the Water Supply and Storage sector, located in Childress, Texas, United States. Taiyo aggregates data on it from Tech Times.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

operational

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Lancium announced a 1.0 GW AI data center campus in Childress, Texas, in partnership with Crusoe. Lancium owns the land, secures the ERCOT grid interconnect, and manages energy infrastructure including power orchestration, behind-the-meter solar, and battery storage. Crusoe designs, builds, and operates the data center buildings. The campus uses a closed-loop, non-evaporative liquid cooling system that requires no additional water input after initial fill. The Childress interconnect has completed the full ERCOT Large Load Interconnection Study and is fully approved and operational since late 2025.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data