Lander University Campus - Centennial Hall Replacements
Construction documents · South Carolina · Last reported Dec 2024
Source: Dodge USA
The removal of the two existing elevator systems, the replacement with two new systems, the modernization/ upgrade of the existing cabs, and the supporting mechanical and electrical infrastructure to ensure operation and code compliance. Contractor to ensure permitting for installation and post installation inspection through the SC LLR requirements.
- Status
- Closed
- Sector
- Education, Power Generation (CCGT), Commercial, Government
- Location
- Greenwood, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lander University Campus - Centennial Hall Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The removal of the two existing elevator systems, the replacement with two new systems, the modernization/ upgrade of the existing cabs, and the supporting mechanical and electrical infrastructure to ensure operation and code compliance. Contractor to ensure permitting for installation and post installation inspection through the SC LLR requirements. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Greenwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Education, Power Generation (CCGT), Commercial, Government |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
