logo

Landfill Cell 6 Expansion

Sector: Government • Location: Billings, Montana, United States of America

Source: Dodge USA

Project
Pre-Design

This project is for the construction of cell 6 at the landfill. The design is planned for FY26 and the construction will be in FY 27. The landfill will be nearing capacity of cells 3, 4 and 5. The construction of cell 6 is needed to continue the ability to take in waste from the City of Billings and surrounding areas. This project is included in the Solid Waste Master Plan. The City of Billings ma

Status
Prospective
Sector
Government, Manufacturing (Industrial), Commercial, Biomass, Waste Processing and Treatment
Location
Billings, Montana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Landfill Cell 6 Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Landfill Cell 6 Expansion” is an infrastructure initiative in the Government sector, located in Billings, Montana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is for the construction of cell 6 at the landfill. The design is planned for FY26 and the construction will be in FY 27. The landfill will be nearing capacity of cells 3, 4 and 5. The construction of cell 6 is needed to continue the ability to take in waste from the City of Billings and surrounding areas. This project is included in the Solid Waste Master Plan. The City of Billings may be seeking a consultant to provide Design for Landfill Cell 6 Expansion.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Montana

City

Billings

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Manufacturing (Industrial), Commercial, Biomass, Waste Processing and Treatment

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project