logo
ProjectClosed

Landscape Maintenance Program for CWD IQC

Closed · Massachusetts · Last reported Feb 2025

Source: Dodge

The Landscape Maintenance Contract will be under the direction of the Watershed Manager through the Reservoir System Manager or other representative. The Reservoir System Manager will make any changes or instruct the Contractor if he/she sees any improprieties or deviations during the landscape maintenance contract period. All landscape maintenance will be done with care, safety and professionalis

Status
Closed
Sector
Water Supply and Storage, Commercial, Manufacturing (Industrial), Government
Location
Cambridge, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Landscape Maintenance Program for CWD IQC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Landscape Maintenance Program for CWD IQC” is an infrastructure initiative in the Water Supply and Storage sector, located in Cambridge, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Landscape Maintenance Contract will be under the direction of the Watershed Manager through the Reservoir System Manager or other representative. The Reservoir System Manager will make any changes or instruct the Contractor if he/she sees any improprieties or deviations during the landscape maintenance contract period. All landscape maintenance will be done with care, safety and professionalism. The turf, trees, shrubs and perennials are living species and will not withstand improper hand...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Cambridge

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Manufacturing (Industrial), Government

Article published date

2025-02-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project