Landscaping and Groundskeeping
Sector: Power Transmission • Location: Weston, Connecticut, United States of America
Source: Dodge USA
l. Mowing and trimming. ( based on 28 cuts with second cuts on Game fields when requested / necessary ) 2. Preseason clean-up ofleaves sticks and debris. 3 Post season clean-up ofleaves sticks and debris. 4. Weeding of baseball and Softball fields when needed. 5. Core Aeration and seeding of all grass areas. * Proper seed mixtures to be utilized to ensure strong athletic field turf growth. ( Rate
- Status
- Closed
- Sector
- Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Weston, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Landscaping and Groundskeeping
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | l. Mowing and trimming. ( based on 28 cuts with second cuts on Game fields when requested / necessary ) 2. Preseason clean-up ofleaves sticks and debris. 3 Post season clean-up ofleaves sticks and debris. 4. Weeding of baseball and Softball fields when needed. 5. Core Aeration and seeding of all grass areas. * Proper seed mixtures to be utilized to ensure strong athletic field turf growth. ( Rate of seed 3-5 lbs./1000 sq.ft..)* 6. Minor landscape projects. (top dressing of scar marks and fill... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Weston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
