Landschlacht Primary School / Lukas Imhof Architektur
Sector: Education
Source: ArchDaily
We interpreted the task in such a way as to create a new spatial order on the site: a new main entrance for the entire complex with a public entrance square on the one hand, and an intimate play and learning courtyard inside the complex on the other, with the third outdoor space being redesigned as a "green schoolroom" under the mighty existing oak tree.Description - The existing school complex wi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | We interpreted the task in such a way as to create a new spatial order on the site: a new main entrance for the entire complex with a public entrance square on the one hand, and an intimate play and learning courtyard inside the complex on the other, with the third outdoor space being redesigned as a "green schoolroom" under the mighty existing oak tree.Description - The existing school complex with the listed core school building, the multipurpose hall from the 1980s and a kindergarten were to be extended with additional classrooms.Text description provided by the architects.Program - Extension of an existing, partially listed school complex as a new building/extension with new surroundings. The extension contains classrooms, group rooms, a library, a new workroom and new access to the old and new buildings.We are addressing the issue of sustainability with unagitated and economical "low-tech" solutions. Large areas of glazing are replaced by "sensibly" large windows with glass with a low solar control function. A large and accessible storage mass enables passive heat storage. Night cooling and geothermal probe heating with geo-cooling regulate the indoor climate.To ensure the best possible system separation, we decoupled components with different lifetimes and minimized interconnected component layers (no suspended ceilings, no glued-on floors, etc.). Electrical cables were not laid in concrete, but remain accessible and traceable in a crawl space and integrated into carpentry work. Ventilation ducts are integrated into the carpentry work - for example as a bench. The outer wall made of single-stone masonry has no other structural layers apart from an inner and outer render. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
