logo
ProjectClosed

Landslide Mitigation Works Phase 3

Closed · British Columbia · Last reported Apr 2023

Source: Dodge USA

Work under this Contract includes, but is not limited to, all supervision, construction, equipment, labour, materials, permits, and related items required for the proposed slope dewatering/stabilization project. Work includes the installation of solid & perforated PVC drainpipe running parallel to the top of bank located within the rear yards of those properties north of Broughton Boulevard, Haddi

Status
Closed
Sector
Commercial, Water Supply and Storage, Waste Processing and Treatment, Government, Seaport
Location
Port Mcneill, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Landslide Mitigation Works Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Landslide Mitigation Works Phase 3” is an infrastructure initiative in the Commercial sector, located in Port Mcneill, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work under this Contract includes, but is not limited to, all supervision, construction, equipment, labour, materials, permits, and related items required for the proposed slope dewatering/stabilization project. Work includes the installation of solid & perforated PVC drainpipe running parallel to the top of bank located within the rear yards of those properties north of Broughton Boulevard, Haddington Crescent, and Cardena Crescent (excluding some areas as completed in phases 1 & 2). Work re...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Port Mcneill

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Waste Processing and Treatment, Government, Seaport

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project