Lane Everett Parking Lot Phase I
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge
119-stall parking lot to be used for additional vehicle storage and sales for the Dwayne Lane vehicle sales business across the street. The work will include filling and grading, installation of stormwater facilities, underground utility stubs, and frontage improvements.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Automotive, Power Transmission, Road, Commercial, Car parking, Water Supply and Storage, Power Generation (CCGT)
- Location
- Everett, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lane Everett Parking Lot Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 119-stall parking lot to be used for additional vehicle storage and sales for the Dwayne Lane vehicle sales business across the street. The work will include filling and grading, installation of stormwater facilities, underground utility stubs, and frontage improvements. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Everett |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Automotive, Power Transmission, Road, Commercial, Car parking, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
