LANUZA WIND PROJECT
Sector: Wind • Location: Spain
Source: European Investment Bank (EIB)
The project consists of the financing of 21 wind farms with sizes ranging from 8 to 50 MW - for a total installed capacity of 547 MW (163 wind turbines), located in Andalucía, Asturias, Castilla la Mancha, Castilla León, Galicia y Navarra. The plants were awarded to the promoter during the third renewable energy auction that was held in Spain in 2017.
- Status
- Under Construction
- Sector
- Wind, Government
- Location
- Spain
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about LANUZA WIND PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the financing of 21 wind farms with sizes ranging from 8 to 50 MW - for a total installed capacity of 547 MW (163 wind turbines), located in Andalucía, Asturias, Castilla la Mancha, Castilla León, Galicia y Navarra. The plants were awarded to the promoter during the third renewable energy auction that was held in Spain in 2017. |
Original sector | Energy |
Location
Country | Spain |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Wind, Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
