logo
Project

LAO: GMS NAM THEUN 2 HYDROELECTRIC PROJECT

Sector: Water Supply and Storage • Location: Lao

Source: Asian Development Bank (ADB)

The Project includes the development, construction and operation of a 1,070 megawatt (MW) trans-basin diversion power on the Nam Theun River, a tributary of the Mekong, in the central region of the Lao People's Democratic Republic (Lao PDR). A 450 square kilometer reservoir will be formed on the Nakai Plateau by constructing a dam 39 meters high northwest of the plateau. Water from the reservoir w

Sector
Water Supply and Storage, Raw Materials, Power Generation (CCGT), Commercial, Hydro, Government
Location
Laos
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about LAO: GMS NAM THEUN 2 HYDROELECTRIC PROJECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “LAO: GMS NAM THEUN 2 HYDROELECTRIC PROJECT” is an infrastructure initiative in the Water Supply and Storage sector, located in Lao. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Company

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes the development, construction and operation of a 1,070 megawatt (MW) trans-basin diversion power on the Nam Theun River, a tributary of the Mekong, in the central region of the Lao People's Democratic Republic (Lao PDR). A 450 square kilometer reservoir will be formed on the Nakai Plateau by constructing a dam 39 meters high northwest of the plateau. Water from the reservoir will drop about 350 meters to a powerhouse. The Project will divert about 260 cubic meters of water per second through a power station to the Xe Bang Fai River Basin, also a tributary of the Mekong. The water discharged from the power house will be released to the Xe Bang Fai through a 27 kilometer channel and a regulating pond. The Project will export 5,354 gigawatt-hours (GWh) of electricity to Thailand and will provide revenue to the Lao PDR through taxes, royalties, and dividend. About 200300 GWh will be supplied to electricity consumers in the Lao PDR. The Project is structured as a build-own-operate-transfer, with a concession period of 31 years, of which the operating period is 25 years. At the end of the concession period, the project facilities will be transferred to the Government free of charge.

Original sector

Energy

Procurement method

Budget

Location

Country

Laos

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Raw Materials, Power Generation (CCGT), Commercial, Hydro, Government

Article published date

2024-12-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project