logo

LAO: GMS NAM THEUN 2 HYDROELECTRIC PROJECT

Sector: Water Supply and Storage • Location: Lao

Source: Asian Development Bank (ADB)

Project

The Project includes the development, construction and operation of a 1,070 megawatt (MW) trans-basin diversion power on the Nam Theun River, a tributary of the Mekong, in the central region of the Lao People's Democratic Republic (Lao PDR). A 450 square kilometer reservoir will be formed on the Nakai Plateau by constructing a dam 39 meters high northwest of the plateau. Water from the reservoir w

Project Information FAQ

Project Information

4 Q
The project “LAO: GMS NAM THEUN 2 HYDROELECTRIC PROJECT” is an infrastructure initiative in the Water Supply and Storage sector, located in Lao. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project includes the development, construction and operation of a 1,070 megawatt (MW) trans-basin diversion power on the Nam Theun River, a tributary of the Mekong, in the central region of the Lao People's Democratic Republic (Lao PDR). A 450 square kilometer reservoir will be formed on the Nakai Plateau by constructing a dam 39 meters high northwest of the plateau. Water from the reservoir will drop about 350 meters to a powerhouse. The Project will divert about 260 cubic meters of water per second through a power station to the Xe Bang Fai River Basin, also a tributary of the Mekong. The water discharged from the power house will be released to the Xe Bang Fai through a 27 kilometer channel and a regulating pond. The Project will export 5,354 gigawatt-hours (GWh) of electricity to Thailand and will provide revenue to the Lao PDR through taxes, royalties, and dividend. About 200300 GWh will be supplied to electricity consumers in the Lao PDR. The Project is structured as a build-own-operate-transfer, with a concession period of 31 years, of which the operating period is 25 years. At the end of the concession period, the project facilities will be transferred to the Government free of charge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data