Lao Nam Theun 2 Power Project (former was under PE-P004206-LEN)
Sector: Road • Location: Lao People's Democratic Republic
Source: World Bank Group
The Nam Theun 2 Hydroelectric (NT2) Project seeks to generate revenues through an environmentally and socially sustainable development of NT2's hydropower potential. The project includes a Social and Environment Project (P049290). The Project Appraisal Document (Report No: 31764-LA) covers both projects (P076445 and P049290). This project includes a) the installation of a hydropower facility that
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Commercial, Government
- Location
- Laos
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Lao Nam Theun 2 Power Project (former was under PE-P004206-LEN)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Nam Theun 2 Hydroelectric (NT2) Project seeks to generate revenues through an environmentally and socially sustainable development of NT2's hydropower potential. The project includes a Social and Environment Project (P049290). The Project Appraisal Document (Report No: 31764-LA) covers both projects (P076445 and P049290). This project includes a) the installation of a hydropower facility that will provide 995 MW power for export to Thailand, and an additional 75 MW for domestic use; b) management of environmental and social impacts on the Nakai Plateau, in the NT2 watershed, and in the down-stream areas of the Nam Theun and Xe Bang Fai (XBF) rivers; and, c) monitoring and evaluation arrangements designed to meet sound engineering practices, fiduciary responsibilities, and the respective oversight requirements of the various financial institutions. The project components are as follows. Component I - NT2 Hydropower Facility - comprises a dam (48 meters high) and a 450 km2 reservoir on the Nam Theun River and the Nakai plateau. Water from the reservoir would be transferred to an above-ground power station, located at the foot of the Nakai escarpment. Component 2 - Management of Environmental and Social Impacts - includes: a) the Nakai Plateau where most of the resettlement will occur; b) the NT2 watershed; c) the downstream area along the XBF river and its tributaries; and, d) the downstream area along the lower NT river and its tributaries. The Social Development Plan (SDP) will be implemented, covering: design and construction of resettlement villages, away from the inundation zone; provision of basic infrastructure and social services; and, design and delivery of livelihood programs. The Environmental Assessment and Management Plan (EAMP) will include: environmental mitigation measures on the Nakai Plateau and in the downstream areas; design and implementation of adaptive wildlife management programs; water quality monitoring and management programs in the reservoir and downstream areas; flood control measures; and, implementation of the riparian release measures. The watershed management includes the preparation and implementation of land use plans in a participatory manner, design and implementation of programs to prevent loss of forest cover, wildlife trade and non-sustainable resource use, and, compensation for livelihood impacts due to resource access restrictions. Component 3 - Monitoring and Evaluation - the monitoring and evaluation (M&E) framework consists of: a) supervision of physical implementation of the hydropower project by professional engineering firms; b) independent review of key project components - dam safety and environment and social impacts; c) systematic monitoring of the technical, and environmental and social safeguards components o f the project during construction, and operation by a professional firm; and, d) advisory services on project implementation, including NT2 revenue management arrangements. A mitigation assessment was conducted on key implementation risks, and mitigation measures stipulate the actions to be taken. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Laos |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
