logo

Lao Nam Theun 2 Power Project (former was under PE-P004206-LEN)

Sector: Road • Location: Lao People's Democratic Republic

Source: World Bank Group

Project
Closed

The Nam Theun 2 Hydroelectric (NT2) Project seeks to generate revenues through an environmentally and socially sustainable development of NT2's hydropower potential. The project includes a Social and Environment Project (P049290). The Project Appraisal Document (Report No: 31764-LA) covers both projects (P076445 and P049290). This project includes a) the installation of a hydropower facility that

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Commercial, Government
Location
Laos
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Lao Nam Theun 2 Power Project (former was under PE-P004206-LEN)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lao Nam Theun 2 Power Project (former was under PE-P004206-LEN)” is an infrastructure initiative in the Road sector, located in Lao People's Democratic Republic. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Nam Theun 2 Hydroelectric (NT2) Project seeks to generate revenues through an environmentally and socially sustainable development of NT2's hydropower potential. The project includes a Social and Environment Project (P049290). The Project Appraisal Document (Report No: 31764-LA) covers both projects (P076445 and P049290). This project includes a) the installation of a hydropower facility that will provide 995 MW power for export to Thailand, and an additional 75 MW for domestic use; b) management of environmental and social impacts on the Nakai Plateau, in the NT2 watershed, and in the down-stream areas of the Nam Theun and Xe Bang Fai (XBF) rivers; and, c) monitoring and evaluation arrangements designed to meet sound engineering practices, fiduciary responsibilities, and the respective oversight requirements of the various financial institutions. The project components are as follows. Component I - NT2 Hydropower Facility - comprises a dam (48 meters high) and a 450 km2 reservoir on the Nam Theun River and the Nakai plateau. Water from the reservoir would be transferred to an above-ground power station, located at the foot of the Nakai escarpment. Component 2 - Management of Environmental and Social Impacts - includes: a) the Nakai Plateau where most of the resettlement will occur; b) the NT2 watershed; c) the downstream area along the XBF river and its tributaries; and, d) the downstream area along the lower NT river and its tributaries. The Social Development Plan (SDP) will be implemented, covering: design and construction of resettlement villages, away from the inundation zone; provision of basic infrastructure and social services; and, design and delivery of livelihood programs. The Environmental Assessment and Management Plan (EAMP) will include: environmental mitigation measures on the Nakai Plateau and in the downstream areas; design and implementation of adaptive wildlife management programs; water quality monitoring and management programs in the reservoir and downstream areas; flood control measures; and, implementation of the riparian release measures. The watershed management includes the preparation and implementation of land use plans in a participatory manner, design and implementation of programs to prevent loss of forest cover, wildlife trade and non-sustainable resource use, and, compensation for livelihood impacts due to resource access restrictions. Component 3 - Monitoring and Evaluation - the monitoring and evaluation (M&E) framework consists of: a) supervision of physical implementation of the hydropower project by professional engineering firms; b) independent review of key project components - dam safety and environment and social impacts; c) systematic monitoring of the technical, and environmental and social safeguards components o f the project during construction, and operation by a professional firm; and, d) advisory services on project implementation, including NT2 revenue management arrangements. A mitigation assessment was conducted on key implementation risks, and mitigation measures stipulate the actions to be taken.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Laos

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project