logo
ProjectProposed

Lao PDR: National Road 13 South Extension Improvement and Maintenance Project

Proposed · Lao PDR

Source: Asian Infrastructure Investment Bank (AIIB)

The project aims to improve, rehabilitate, and maintain a critical 50 km section of NR13, which serves as the sole access route from the South to the capital city of Vientiane. This section begins at KM21 in the suburban area of Vientiane Capital and extends southwards to KM71 in Xaysavang village, located in Thaprabath District, Bolihamxay province. The first 20 km of this section will be expande

Status
Prospective
Sector
Water Supply and Storage, Government, Consumer Products, Road, Commercial, Power Transmission, Power Generation (CCGT)
Location
Laos
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Lao PDR: National Road 13 South Extension Improvement and Maintenance Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lao PDR: National Road 13 South Extension Improvement and Maintenance Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Lao PDR. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project aims to improve, rehabilitate, and maintain a critical 50 km section of NR13, which serves as the sole access route from the South to the capital city of Vientiane. This section begins at KM21 in the suburban area of Vientiane Capital and extends southwards to KM71 in Xaysavang village, located in Thaprabath District, Bolihamxay province. The first 20 km of this section will be expanded from two to four lanes and the following 30 km will undergo rehabilitation. The road improvement and maintenance will be carried out through a 10-year Output- and Performance-Based Road Contract (OPBRC) under the Design, Build, Maintain, Operate, and Transfer (DBMOT) method. The project will also carry out capacity-building activities to strengthen the Ministry of Public Works and Transport (MPWT) staff's capacity in managing road assets. This includes designing and implementing OPBRC, addressing road safety and climate resilience issues, and preparing future projects for improving and maintaining other critical sections of NR13. The components and their financing sources are as follows: Component 1 (financed jointly by AIIB, Abu Dhabi Fund for Development (ADFD) and Government of Lao PDR (GoL)). Road Improvement, Rehabilitation, Maintenance and Operation. Component 2 (financed by AIIB). Provision of Monitoring, Technical assistance, and preparation of future investments.

Original sector

Transport

Procurement method

Budget

Location

Country

Laos

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Consumer Products, Road, Commercial, Power Transmission, Power Generation (CCGT)

Article published date

2024-10-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project