Large Diameter Culvert Rehab
Closed · Colorado · Last reported Oct 2024
Source: Dodge USA
Large-Diameter Culvert Rehab for Upper Bear Creek Road and Fall River Road Culvert slip lining of 96-inch Spirolite pipe on Upper Bear Creek Road and side-by-side culvert replacement of two 42-inch RCP on Fall River Road. Other features include riprap end treatments, asphalt patching, striping, shouldering, dewatering, and traffic control.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government
- Location
- Evergreen, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Large Diameter Culvert Rehab
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Large-Diameter Culvert Rehab for Upper Bear Creek Road and Fall River Road Culvert slip lining of 96-inch Spirolite pipe on Upper Bear Creek Road and side-by-side culvert replacement of two 42-inch RCP on Fall River Road. Other features include riprap end treatments, asphalt patching, striping, shouldering, dewatering, and traffic control. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Evergreen |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
