logo

Largest solar facility in New Caledonia

Sector: Commercial • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project
Achevé

The project involves building and operating a solar power plant with a capacity of 11.2 MWc in the South Province, in Boulouparis. The power plant, which is the largest existing solar facility in New Caledonia, comprises 43,000 panels covering 20 hectares. It was commissioned at the end of April 2017.It will provide an electricity supply equivalent to 5,400 households. The energy produced will be

Project Information FAQ

Project Information

4 Q
The project “Largest solar facility in New Caledonia” is an infrastructure initiative in the Commercial sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

achevé

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves building and operating a solar power plant with a capacity of 11.2 MWc in the South Province, in Boulouparis. The power plant, which is the largest existing solar facility in New Caledonia, comprises 43,000 panels covering 20 hectares. It was commissioned at the end of April 2017.It will provide an electricity supply equivalent to 5,400 households. The energy produced will be sold via a long-term power purchase agreement to Enercal, a semi-public company majority owned by New Caledonia. A similar (but smaller) project has also been financed at the same time in Temala in the North Province. It is the first photovoltaic power plant on customary land. All the materials selected for the facilities are recyclable, their lifespan is in line with the project, and the facilities installed are fully reversible. All the equipment which will be installed will be dismantled at the end of the operating period.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data