Larimer Co Dry Creek Monroe Ave Bridge Replacement
Sector: Water Supply and Storage • Location: Berthoud, Colorado, United States of America
Source: Dodge
Replacement of an existing 2-span rubble arch culvert with a single-span, prestressed concrete slab bridge (52 -7 long and 51 -0 wide); includes channel stabilization and armoring, as well as sidewalk tie-ins/transitions within the project footprint.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Cement, Road, Government, Waste Processing and Treatment, Car parking, Automotive, Commercial
- Location
- Berthoud, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Larimer Co Dry Creek Monroe Ave Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of an existing 2-span rubble arch culvert with a single-span, prestressed concrete slab bridge (52 -7 long and 51 -0 wide); includes channel stabilization and armoring, as well as sidewalk tie-ins/transitions within the project footprint. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Berthoud |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Cement, Road, Government, Waste Processing and Treatment, Car parking, Automotive, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
