Larry's Creek Water Treatment Plant
Sector: Water Supply and Storage • Location: Jersey Shore, Pennsylvania, United States of America
Source: Dodge USA
Contract No. WR1: General-Mechanical Work Contract No. WR2: Electrical Work The work involves construction of a new 2.0 million gallon per day capacity water treatment facility including earthwork, access roads, mechanical piping and equipment, membrane filtration system (cartridge type), chemical feed and storage systems, finish water clearwell, wastewater holding tanks, solids drying beds, a che
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Power Generation (CCGT), Chemical (Industrial), Commercial, Road, Manufacturing (Industrial)
- Location
- Jersey Shore, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Larry's Creek Water Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contract No. WR1: General-Mechanical Work Contract No. WR2: Electrical Work The work involves construction of a new 2.0 million gallon per day capacity water treatment facility including earthwork, access roads, mechanical piping and equipment, membrane filtration system (cartridge type), chemical feed and storage systems, finish water clearwell, wastewater holding tanks, solids drying beds, a chemical pretreatment building, water transmission main, yard piping, instrumentation control and mo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Jersey Shore |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Power Generation (CCGT), Chemical (Industrial), Commercial, Road, Manufacturing (Industrial) |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
