logo

Las Gallinas Valley Sanitary District Solar Project

Sector: Road • Location: San Rafael, California, United States

Source: Marin Independent Journal

Project
Under Construction

Installation of a 1-megawatt solar photovoltaic system with nearly 1,600 panels at the Las Gallinas Valley Sanitary District headquarters in San Rafael, California. The project replaces a previous 588-kilowatt system and includes a second phase to install a battery storage system with over 2,100 kilowatt hours capacity and a four-hour discharge duration.

Status
Under Construction
Sector
Road, Solar, Water Supply and Storage, Energy Storage, Waste Processing and Treatment, Power Generation (CCGT), Government
Location
San Rafael, California, United States of America
Updated
22 Jul 2026
Source
Marin Independent Journal

ConstructChat

Ask ConstructChat about Las Gallinas Valley Sanitary District Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Las Gallinas Valley Sanitary District Solar Project” is an infrastructure initiative in the Road sector, located in San Rafael, California, United States. Taiyo aggregates data on it from Marin Independent Journal.

Participants

Sponsoring Agency

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Installation of a 1-megawatt solar photovoltaic system with nearly 1,600 panels at the Las Gallinas Valley Sanitary District headquarters in San Rafael, California. The project replaces a previous 588-kilowatt system and includes a second phase to install a battery storage system with over 2,100 kilowatt hours capacity and a four-hour discharge duration.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

California

City

San Rafael

Source

Source

Marin Independent Journal

URL

More Details

Record type

Project

Sector

Road, Solar, Water Supply and Storage, Energy Storage, Waste Processing and Treatment, Power Generation (CCGT), Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project