Laseraway Building First Floor Tenant Improvement
Start · Ohio · Last reported Apr 2025
Source: Dodge
Interior tenant improvement work only. Scope of work to include mechanical, electrical and plumbing. New non load bearing partitions, ceiling, interior doors, finishes and hvac. Electrical and plumbing will be separate submittals per city requirements. Fire sprinklers are a deferred submittal. -HVAC INCLUDED Design new Retail space to include Water Fountain, Water Heater, (4) Indoor FRV Fan Coil U
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Cincinnati, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Laseraway Building First Floor Tenant Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interior tenant improvement work only. Scope of work to include mechanical, electrical and plumbing. New non load bearing partitions, ceiling, interior doors, finishes and hvac. Electrical and plumbing will be separate submittals per city requirements. Fire sprinklers are a deferred submittal. -HVAC INCLUDED Design new Retail space to include Water Fountain, Water Heater, (4) Indoor FRV Fan Coil Units, (4) Outdoor VRF Condensing Units, (2) Existing Vertical Fan Coil Units. Total Square Feet: ... |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Cincinnati |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
