logo

LASTC Mixed Use Development Building B

Sector: Car parking • Location: New Orleans, Louisiana, United States of America

Source: Dodge USA

Project
Construction Documents

114 units - . Building B is a 4-story 156,289sf mixed-use building with commercial and enclosed parking on the first floor and residential units on floors 2-4. This building will contain 81 residential units. All ground-floor commercial units to be white-box only and will require separate permits to build out

Status
Closed
Sector
Car parking, Residential, Commercial, Automotive, Steel, Manufacturing (Industrial)
Location
New Orleans, Louisiana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about LASTC Mixed Use Development Building B

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “LASTC Mixed Use Development Building B” is an infrastructure initiative in the Car parking sector, located in New Orleans, Louisiana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

114 units - . Building B is a 4-story 156,289sf mixed-use building with commercial and enclosed parking on the first floor and residential units on floors 2-4. This building will contain 81 residential units. All ground-floor commercial units to be white-box only and will require separate permits to build out

Procurement method

Budget

Location

Country

United States of America (USA)

State

Louisiana

City

New Orleans

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Residential, Commercial, Automotive, Steel, Manufacturing (Industrial)

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project