Lateral 73-36 Check One Replacement
Sector: Water Supply and Storage • Location: Poston, Arizona, United States of America
Source: Dodge USA
The Lateral 73-36 Check 1 Replacement project shall be carried out in accordance with the contract provisions, technical specifications, and design drawings. The project includes the following principal components: 1) Construct a temporary bypass channel composed of earthen fill to dewater the area where the replacement Check 1 structure will be constructed. 2) Install sheetpile flow barriers at t
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Poston, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lateral 73-36 Check One Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lateral 73-36 Check 1 Replacement project shall be carried out in accordance with the contract provisions, technical specifications, and design drawings. The project includes the following principal components: 1) Construct a temporary bypass channel composed of earthen fill to dewater the area where the replacement Check 1 structure will be constructed. 2) Install sheetpile flow barriers at the entrance and exit of the temporary bypass channel to isolate the temporary bypass work area fr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Poston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
