logo
ProjectPlanning Schematics

Laurel Bay-Phase 1 Infrastructure Plan

Planning schematics · South Carolina · Last reported Sep 2025

Source: Dodge

The Phase 1 Infrastructure Plan includes all necessary utility line extensions along the new road sections of Orange Tip Dr. and approximately 2,400 LF of roadway into the Medway Tract.

Status
Prospective
Sector
Road, Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Consumer Products
Location
Goose Creek, South Carolina, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Laurel Bay-Phase 1 Infrastructure Plan

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Laurel Bay-Phase 1 Infrastructure Plan” is an infrastructure initiative in the Road sector, located in Goose Creek, South Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Phase 1 Infrastructure Plan includes all necessary utility line extensions along the new road sections of Orange Tip Dr. and approximately 2,400 LF of roadway into the Medway Tract.

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Goose Creek

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Consumer Products

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project