Laurel Grating and Handrails Replace
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work generally consists of removing and replacing the existing fiberglass grating and handrails with aluminum grating and handrails at the grit chamber and the U.V. chamber at both of the City s wastewater plants.
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Steel, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial
- Location
- Laurel, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Laurel Grating and Handrails Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work generally consists of removing and replacing the existing fiberglass grating and handrails with aluminum grating and handrails at the grit chamber and the U.V. chamber at both of the City s wastewater plants. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Laurel |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Steel, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
