logo

Laurel Road-Maxwell Boulevard Intersection Project

Sector: Road • Location: Brunswick, Ohio, United States

Source: Cleveland

Project
Planned

The project involves the installation of a single-lane roundabout and full reconstruction of Laurel Road between Pinewood and Coventry drives in Brunswick, Ohio. It is currently in the preliminary layout phase and anticipated to begin in 2026.

Status
Prospective
Sector
Road, Government
Location
Brunswick, Ohio, United States of America
Updated
22 Jul 2026
Source
Cleveland

ConstructChat

Ask ConstructChat about Laurel Road-Maxwell Boulevard Intersection Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Laurel Road-Maxwell Boulevard Intersection Project” is an infrastructure initiative in the Road sector, located in Brunswick, Ohio, United States. Taiyo aggregates data on it from Cleveland.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the installation of a single-lane roundabout and full reconstruction of Laurel Road between Pinewood and Coventry drives in Brunswick, Ohio. It is currently in the preliminary layout phase and anticipated to begin in 2026.

Original sector

Infrastructure

Location

Country

United States of America (USA)

State

Ohio

City

Brunswick

Source

Source

Cleveland

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2025-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project