Laurence G. Hanscom Field Parking Lot Repair
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Provide all labor, tools, equipment, materials, and supervision required to replace the existing asphalt pavement for the Bedford Air Traffic Control Tower (BED ATCT) parking lot and curbing. Included with this project is milling of required transitions, installation of 2-inch binder strengthening course, installation of 1- inch wearing course, painting of pavement markings, removal and re-install
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Car parking, Waste Processing and Treatment, Road, Automotive, Manufacturing (Industrial)
- Location
- Bedford, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Laurence G. Hanscom Field Parking Lot Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provide all labor, tools, equipment, materials, and supervision required to replace the existing asphalt pavement for the Bedford Air Traffic Control Tower (BED ATCT) parking lot and curbing. Included with this project is milling of required transitions, installation of 2-inch binder strengthening course, installation of 1- inch wearing course, painting of pavement markings, removal and re-installation of curbing, asphalt sealing and grading as necessary to transition to the existing storm dr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Bedford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Car parking, Waste Processing and Treatment, Road, Automotive, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
