Lauriston Solar Farm
Sector: Solar • Location: Lauriston, Canterbury, New Zealand
Source: Otago Daily Times
A $104 million solar farm launched by Genesis and FRV Australia in Lauriston, Canterbury, with over 90,000 solar panels on a 93-hectare site. It generates up to 100GWh of electricity annually, enough to power nearly 13,000 households.
- Status
- Closed
- Sector
- Solar, Raw Materials, Power Generation (CCGT)
- Location
- Lauriston, Canterbury, New Zealand
- Updated
- 22 Jul 2026
- Source
- Otago Daily Times
ConstructChat
Ask ConstructChat about Lauriston Solar Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $104 million solar farm launched by Genesis and FRV Australia in Lauriston, Canterbury, with over 90,000 solar panels on a 93-hectare site. It generates up to 100GWh of electricity annually, enough to power nearly 13,000 households. |
Original sector | Energy |
Budget |
Location
Country | New Zealand |
State | Canterbury |
City | Lauriston |
Source
Source | Otago Daily Times |
URL |
More Details
Record type | Project |
Sector | Solar, Raw Materials, Power Generation (CCGT) |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
