Lava Ridge Wind Project
One of 10,000+ projects Taiyo tracks in Idaho.
Source: The Victoria Advocate
The Lava Ridge Wind Project in Idaho has been halted due to an executive order from President Trump. This project was aimed at generating renewable energy through wind power.
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT)
- Location
- Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- The Victoria Advocate
ConstructChat
Ask ConstructChat about Lava Ridge Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lava Ridge Wind Project in Idaho has been halted due to an executive order from President Trump. This project was aimed at generating renewable energy through wind power. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Idaho |
Source
Source | The Victoria Advocate |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT) |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States
- Apex Expansion Project, Kern River
- EnLink Midstream’s Ohio River Valley Condensate Pipeline, Utica Shale, Ohio
- Port Arthur LNG Facility, Texas
- Calcasieu Pass LNG Export Facility, Louisiana
- Midship Natural Gas Pipeline, Oklahoma, USA
- Gatorade Plant, Pepsi Co, Oklahoma
- Wells Dairy Ice Cream Production Facility, St George, Utah
- Brooklyn Brewery Facility, Williamsburg, Brooklyn, New York
