Lavender Heights Water Main Replacement
Sector: Metal • Location: Sacramento, California, United States of America
Source: Dodge USA
The existing 6-inch diameter cast iron water mains in the Lavender Heights area of Midtown, Sacramento (part of the Central City Corridor), have extended past their useful life and are not able to provide sufficient water flow to meet future customer demands or required fire flow. The Lavender Heights Water Main Replacement Project aims to expand and upgrade water infrastructure, help create a mor
- Status
- Closed
- Sector
- Metal, Government, Water Supply and Storage, Waste Processing and Treatment, Steel, Commercial
- Location
- Sacramento, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lavender Heights Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing 6-inch diameter cast iron water mains in the Lavender Heights area of Midtown, Sacramento (part of the Central City Corridor), have extended past their useful life and are not able to provide sufficient water flow to meet future customer demands or required fire flow. The Lavender Heights Water Main Replacement Project aims to expand and upgrade water infrastructure, help create a more gridded/looped distribution system, improve water quality and move water more efficiently throu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Sacramento |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Government, Water Supply and Storage, Waste Processing and Treatment, Steel, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
