logo

LAWRENCEVILLE MULTI-USE TRAILS

Sector: Car parking • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The proposed project is the construction of sidewalks and streetscapes in the City of Lawrenceville. Construction of a sidewalks and streetscapes trail along Luckie Street, North on Chestnut Street, East on Highway 29 (aka E. Crogan Street), connecting Gwinnett Justice and Administration Center and Rhodes Jordan Park, utilizing and enhancing the existing sidewalks along this path through the City

Project Information FAQ

Project Information

4 Q
The project “LAWRENCEVILLE MULTI-USE TRAILS” is an infrastructure initiative in the Car parking sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project is the construction of sidewalks and streetscapes in the City of Lawrenceville. Construction of a sidewalks and streetscapes trail along Luckie Street, North on Chestnut Street, East on Highway 29 (aka E. Crogan Street), connecting Gwinnett Justice and Administration Center and Rhodes Jordan Park, utilizing and enhancing the existing sidewalks along this path through the City of Lawrenceville. Transportation Enhancement (TE) funds are limited from Luckie Street/Constitution Boulevard along E. Crogan Street terminating at Atha Street. SPLOST funds are limited from Atha Street along E. Crogan Street terminating into Rhodes Jordan Park and will be implemented as a separate phase before the TE fund section. Road work or number of lanes will not be impacted, most sidewalks will remain the same width, but brick inlay shall be added and proposed sidewalks will include brick inlay.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data