LAWRENCEVILLE MULTI-USE TRAILS
Sector: Power Transmission • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed project is the construction of sidewalks and streetscapes in the City of Lawrenceville. Construction of a sidewalks and streetscapes trail along Luckie Street, North on Chestnut Street, East on Highway 29 (aka E. Crogan Street), connecting Gwinnett Justice and Administration Center and Rhodes Jordan Park, utilizing and enhancing the existing sidewalks along this path through the City
- Status
- Closed
- Sector
- Power Transmission, Road, Power Generation (CCGT), Car parking, Automotive, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about LAWRENCEVILLE MULTI-USE TRAILS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project is the construction of sidewalks and streetscapes in the City of Lawrenceville. Construction of a sidewalks and streetscapes trail along Luckie Street, North on Chestnut Street, East on Highway 29 (aka E. Crogan Street), connecting Gwinnett Justice and Administration Center and Rhodes Jordan Park, utilizing and enhancing the existing sidewalks along this path through the City of Lawrenceville. Transportation Enhancement (TE) funds are limited from Luckie Street/Constitution Boulevard along E. Crogan Street terminating at Atha Street. SPLOST funds are limited from Atha Street along E. Crogan Street terminating into Rhodes Jordan Park and will be implemented as a separate phase before the TE fund section. Road work or number of lanes will not be impacted, most sidewalks will remain the same width, but brick inlay shall be added and proposed sidewalks will include brick inlay. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Power Generation (CCGT), Car parking, Automotive, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
