Lawton Maps 46 Water Line Improvements REBID
Sector: Water Supply and Storage • Location: Lawton, Oklahoma, United States of America
Source: Dodge
Project is to abandon approximately 10,000 linear feet (LF) of existing 4- to 10-inch water line in residential areas, and to replace with 8- to 10-inch water line. Scope includes: * Open cut installation * Incorporating associated components such as gate valves, water meters, and fire hydrants. All other information relating to this project is contained within the attached Contract Documents. Est
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Residential, Commercial
- Location
- Lawton, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lawton Maps 46 Water Line Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project is to abandon approximately 10,000 linear feet (LF) of existing 4- to 10-inch water line in residential areas, and to replace with 8- to 10-inch water line. Scope includes: * Open cut installation * Incorporating associated components such as gate valves, water meters, and fire hydrants. All other information relating to this project is contained within the attached Contract Documents. Estimated Cost Range of Project: From $4,505,000 to $4,981,000. Time for project completion: 180 cal... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Lawton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Residential, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
