logo

LAX Central Utility Plant

Sector: Airport • Location: Los Angeles, California, United States

Source: McCarthy Building Companies

Project
Completed

The new 90,000-square-foot Central Utility Plant (CUP) for Los Angeles International Airport (LAX) was built to replace the existing 50-year old facility with a modern, state-of-the-art, computer-managed utility plant providing enhanced passenger comfort and reliability of utility service and safety within the newly modernized terminals at LAX. The project included demolition of the existing CUP a

Project Information FAQ

Project Information

4 Q
The project “LAX Central Utility Plant” is an infrastructure initiative in the Airport sector, located in Los Angeles, California, United States. Taiyo aggregates data on it from McCarthy Building Companies.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new 90,000-square-foot Central Utility Plant (CUP) for Los Angeles International Airport (LAX) was built to replace the existing 50-year old facility with a modern, state-of-the-art, computer-managed utility plant providing enhanced passenger comfort and reliability of utility service and safety within the newly modernized terminals at LAX. The project included demolition of the existing CUP as well as construction of a 64,000-square-foot, steel-framed replacement CUP with a 20,000-ton cooling capacity. The project also entailed the installation of associated equipment, such as a stand-by boiler, primary and secondary chilled water pumps, cooling towers, electrical systems and switchgear. A maintenance shop and offices as well as an above-grade thermal energy storage (TES) tank with capacity for 1.6 million gallons of water and 15,500 ton-hours of cooling was also built. Other work included: replacement of approximately 18 miles of pipe and duct bank that services the entire Central Terminal Area (CTA) with utility distribution, electrical and communications systems as well as reclaimed water, fire water and potable water systems; installation of several miles of new distribution piping throughout the CTA and beneath existing main entrance roadways throughout the airport; and an upgrade of pump rooms and air handling equipment in 21 different locations within all terminals, administrative buildings and the LAX Theme Building. The CUP structure was designed as an essential facility with stringent seismic drift criteria to protect the facility during a major earthquake.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data