Lazaro Cardenas third multi-purpose terminal
Sector: Seaport • Location: Mexico
Source: World Bank Group
The port of Lazaro Cardenas was the largest Mexican seaport and one of the largest seaports in the Pacific Ocean basin in 2013, located in Michoacan State, with an annual traffic capacity of around 25 million tonnes of cargo and 2,200,000 TEU's (2013). It was comprised of public and private terminals. Among the public terminals there were: grain, multi-purpose and container terminals. This project
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The port of Lazaro Cardenas was the largest Mexican seaport and one of the largest seaports in the Pacific Ocean basin in 2013, located in Michoacan State, with an annual traffic capacity of around 25 million tonnes of cargo and 2,200,000 TEU's (2013). It was comprised of public and private terminals. Among the public terminals there were: grain, multi-purpose and container terminals. This project refers to the third multi-use terminal of the port, some other terminals of the port are included under different project numbers. Lazaro Cardenas Third Multipurpose Terminal (LCMT) was a multipurpose terminal located in the port of Lazaro Cardenas. It had a total area of 19.6 hectares, a 286 metre berth with depth alongside of 14 metres. Hutchison Port Holdings (HPH) won a 30-year concession to operate the third multi-use terminal at Lazaro Cardenas port in November 2012. HPH was expected to invest some US$59.5million (784 million pesos) in the terminal. In May 2013 the terminal was already operational. HPH carried out an equipment installation phase that included the installation of 30 forklifts, 10 tractors and 10 grain trucks. HPH also operated one of Lazaro Cardenas' container terminals. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
